Green Collar Job Training - Free

#

Course Title
100 Home
101 Introduction
102 FAQ Page
103 Course Catalog
104 Green World
105 Demand & Supply
106 Conservation Careers
107 Solar Careers
108 Wind Turbine Careers
109 Entrepreneurs
110 Employee or Employer?
200 Demand Management
201 Summary
202 Residential Energy Profile
203 Ten Conservation Rules
204 HVAC System
205 Kitchen Appliances
206 Water Heater
207 Lighting
208 Laundry Appliances
209 Calculating Savings
300 Renewable Technology
301 Solar Energy
302 Solar Collectors
303 Solar Water Heating
304 Stirling Engines
305 Basic AC-DC Electronics
306 Silicon Solar Panels
307 Thin Film Solar Panels
308 Wind Turbines
309 Inverters
310 Grid Tied and Off Grid
311 Solar Site Survey
312 Solar Site Diagram
313 Sun Path Chart
314 Site Survey Worksheet
315 Wind Turbine Site Survey
316 Wind Turbine Worksheet
400 Solar Thermal Design
401 Solar Heat Overview
402 System Configuration
403 Site Survey
404 SRCC Compliance
405 System Specification
406 Bill of Materials
407 System Installation
408 Solar Heat Incentives
409 Document Package
410 Future Products
500 Solar PV Design
501 Solar PV Overview
502 System Configuration
503 Site Survey
504 Grid Tied & Off Grid
505 System Specification
506 Bill of Materials
507 System Installation
508 Solar PV Incentives
509 Document Package
510 Future Products
600 Wind Turbine Design
601 Wind Turbine Overview
602 System Configuration
603 Site Survey
604 Grid Tied and Off Grid
605 System Specification
Green Collar Links
Green Collar Sponsors

 

Green Collar Careers - Solar PV Document Package

As with any technology products, an accurate and complete Document Package will need to be prepared for the Customer.  The following list of documents along with some examples are listed in this table:

 

Title Description Purpose
Site Survey Data Provides energy specifications for system per the site requirements Identifies expected performance level
System Diagram Diagram of solar heating system Illustrates system components 
Bill of Materials Identifies all components installed in the system Provides list of replacement components
Sun Path Chart Provides available solar exposure to the collector at the time of installation Provides original site data in the event system performance changes due to shadowing not present at the time of site survey
Utility Specific Requirements Printed Requirements for components and specifications that are required for Grid Tied AC Service Provides  utility requirements for system components
Utility Approval Letter Approval from Utility for Grid Tied system Provides authenticity utility requirements are met
Solar PV Panel Installation Sheet Identifies installation process Provided by the vendor
Inverter Installation Sheet Identifies installation process Provided by the vendor
Inverter Operations Manual Identifies operations process Provided by the vendor
Permit Request In conjunction with System Installation Manual is filed with local authorities for building permit To authorize system installation by local building authorities.
System Quote Quote package for customer, including installation.   Used both for customer decision with potential to be used by the customer to validate lending requirements.  Requires 60 day minimum price lock.
System Invoice Provides billing to customer along with payment terms. To collect billing.